WORKING WITH RUTLAND PLASTICS SAVES TIME AND MONEY
PROJECT MANAGEMENT
You can count on us to bring your product to market. We will create a clear project management plan and ensure that you are kept informed about your project at each stage of the process. You will benefit from expert guidance and support in every aspect and we will do so collaboratively with the promise that you will always be able to speak to our technical team whatever your enquiry.
Signing a Non Disclosure Agreement (NDA) is fairly common practice and we are happy to sign an agreement. You can download our standard NDA here (*link) and we can start the process to provide you with access to a ‘no-obligation’ audit and quote for your part, so it costs nothing to discover whether or not injection moulding is suited to your application.
We carry out a thorough review of the part for injection moulding to fully optimise every aspect for plastic injection moulding to include cost and time efficiencies, quality. It is at this stage that we will suggest recommendations and modifications that will improve the part for injection moulding manufacture.
Tool trials are carried out by design engineers to ensure that the capability and reliability, conduct a full tool design review to pass off the mould design before manufacture can proceed.
Sea and air freight options offered where the tool has been made overseas. On tool arrival, our toolroom maintenance team will de-crate, strip clean and fully inspect the mould before it goes into a press for trial on site.
From simple visual confirmation and sample approval sign off to full PPAP (Production Part Approval Process) style approval we will work with you to fully approve your part to the level you require.
At this stage the project is handed over to the production team for mass production.
Full capacity for dimension ISIR reporting.
Master retained samples held.
Part specific Quality plans produced for each part reflecting agreed quality levels at approval stage.
Part specific production dimensional and first off checks assigned for each part.
At handover from approval to production parts are controlled, scheduled and manufactured using the company wide ERP system.
Service contact assigned?
We observe continuous improvement and best practices and will always look to advise of ways for streamlining work and reducing waste, cost and time.